News

6-7 Bridge Street, York, June 2016- July 2017

Main Contractor- Scothern Contruction LtdThis project was the conversion of an old 4 story building and basement previously used as offices. Apartments were added to the 1st, 2nd and 3rd floor with lift access all finished to a very high …

Posted By Website Admin - 27-07-2017Read More

Upstage Centre Youth Theatre

2017 - Emergency Lighting and door magnets to operate with the fire alarm.   We carried out a full upgrade of the emergency lighting throughout the building. A survey was carried out and the installation was re designed so …

Posted By Website Admin - 16-06-2017Read More

Jorvik Viking Centre Refurbishment 2016-2017 (following the floods in York at Christmas 2015)

Having carried out a full inspection and test including remedial work along with maintenance and various improvements over the past 5 years, as the main electrical contractor for the centre we were the first on site, once the water had been pu…

Posted By Website Admin - 16-06-2017Read More

Begravia Stone

Replacement of TP +N fuse board and installation of new supplies for additional machinery. All work carried out was done out of hours to cause minimum disruption.   June 2016 …

Posted By Website Admin - 16-06-2017Read More

Hipswell C of E Primary School

Working along side the main contractor William Birch & Sons Ltd,we carried out refurbishment of the Childrens toilets which included LED lighting operated via PIR sensors,emergency lighting, hand dryers,Fire alarms, Auto flush and auto taps, to g…

Posted By Website Admin - 16-06-2017Read More